Building an ice bridge

Tech. Sgt. Tim Broderick pumps water from the Tanana River to build up the ice thickness Nov. 24, 2008, at Fairbanks, Alaska. The ice bridge takes six to 10 weeks to complete in sub-zero weather. It is five-feet deep, 32 miles long and capable of supporting more than 110 tons -- and will melt back into the river when spring thaw hits. The ice bridge enables 354th CES Airmen to access and perform annual maintenance at Blair Lakes Bombing Range. Sergeant Broderick is assigned to the 354th Civil Engineer Squadron range maintenance. (U.S. Air Force photo/Senior Airman Jonathan Snyder)

PHOTO BY: Unknown
VIRIN: 081124-F-4127S-062.JPG
FULL SIZE: 3.39 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.