• Finance gets reshaped during service-wide cut backs

    The 354th Comptroller Squadron is taking its first steps into a major overhaul of its day-to-day business practices.   The changes within the squadron are in preparation for the Air Force-wide personnel drawdown taking place over the next two years and a service-wide consolidation of financial

  • RV, ATV, trailor storage regulations enforced

    With the many fishing and camping trips taken during the Alaska summer, Icemen may want to keep their boats, all-terrain vehicles and recreational vehicles in their driveways between trips, but 354th Fighter Wing policy outlines the guidelines which must be followed by base housing residents. The

  • Eielson summer construciton underway

    Summer construction has begun and Eielson residents can look forward to a plethora of upgrades and improvements to base roadways and buildings as well as groundbreaking of new quality of life projects.   One significant change that will affect base drivers immediately is a temporary reduction in

  • Base heat, electricity source shuts down for maintenance

    For the first time in over 23 years, Eielson's Central Heat and Power Plant will be completely shut down June 6 and will restart June 27. The base will be importing power from the local utility of the Golden Valley Electric Association during the scheduled time. The facility is undergoing major

  • Joint forces combine for Red Flag-Alaska exercise

    More than 1,400 military members from the United States, Singapore and Australia have converged on Alaska to sharpen their collective warfighting edge in Red Flag-Alaska 07-2, which runs from May 31 to June 15. Red Flag-Alaska, a series of Pacific Air Forces commander-directed field training

  • Base power, electricity source shuts down for maintenance

    For the first time in over 23 years, Eielson's Central Heat and Power Plant will be completely shut down June 6 and will restart June 27. The base will be importing power from the local utility of the Golden Valley Electric Association during the scheduled time. The facility is undergoing major